Agreement No. CE 11/2002 (DS)

Drainage Improvement in Sai Kung – Design and Construction

 

Final Environmental Impact Assessment Report (Volume 2)

 

 

 

TABLE OF CONTENTS

 

 

List of Figures

 

Figure 1.1                 Location Plan of Sai Kung River, Pak Kong River and Ho Chung Channel

Figure 1.2                 General Layout of Sai Kung River and Sha Ha Diversion Culvert

Figure 1.3                 General Layout of Pak Kong River

Figure 1.4                 General Layout of Ho Chung Channel

Figure 1.5                 General Cross Sections

Figure 1.6                 Typical Cut Sections

Figure 1.7                 Retaining Walls for Gabion Channel

Figure 2.1                 Preliminary Construction Programme

Figure 2.2a                Location of Concurrent Projects – Sai Kung River and Sha Ha Division Culvert

Figure 2.2b                Location of Concurrent Projects – Pak Kong River

Figure 2.2c                Location of Concurrent Projects – Ho Chung Channel

Figure 3.1                 Locations of Air Sensitive Receivers (Sai Kung River and Sha Ha Diversion Culvert)

Figure 3.2                 Locations of Air Sensitive Receivers (Pak Kong River)

Figure 3.3                 Locations of Air Sensitive Receivers (Ho Chung Channel)

Figure 3.4                 Contour of 1-Hour Average Total Suspended Particulate Concentration in mg/m3 at 1.5 m Above Ground (Sai Kung River and Sha Ha Diversion Culvert)

Figure 3.5                 Contour of 24-Hour Average Total Suspended Particulate Concentration in mg/m3 at 1.5 m Above Ground (Sai Kung River and Sha Ha Diversion Culvert)

Figure 3.6                 Contour of 1-Hour Average Total Suspended Particulate Concentration in mg/m3 at 1.5 m Above Ground (Pak Kong River)(a, b)

Figure 3.7                 Contour of 24-Hour Average Total Suspended Particulate Concentration in mg/m3 at 1.5 m Above Ground (Pak Kong River)(a, b)

Figure 3.8                 Contour of 1-Hour Average Total Suspended Particulate Concentration in mg/m3 at 1.5 m Above Ground (Ho Chung Channel)

Figure 3.9                 Contour of 24-Hour Average Total Suspended Particulate Concentration in mg/m3 at 1.5 m Above Ground (Ho Chung Channel)

Figure 4.1                 Noise Sensitive Receivers within 300m from the Project Boundary (Sai Kung River and Sha Ha Diversion Culvert)

Figure 4.2                 Noise Sensitive Receivers within 300m from the Project Boundary (Pak Kong River)

Figure 4.3                 Noise Sensitive Receivers within 300m from the Project Boundary (Ho Chung Channel)

Figure 4.4                 Locations of Representative Noise Sensitive Receivers (Sai Kung River and Sha Ha Diversion Culvert)

Figure 4.5                 Locations of Representative Noise Sensitive Receivers (Pak Kong River)

Figure 4.6                 Locations of Representative Noise Sensitive Receivers (Ho Chung Channel)

Figure 4.7                 Proposed Locations of Temporary Noise Barriers (Sai Kung River and Sha Ha Diversion Culvert)

Figure 4.8                 Proposed Locations of Temporary Noise Barriers (Pak Kong River)

Figure 4.9                 Proposed Locations of Temporary Noise Barriers (Ho Chung Channel)

Figure 5.1                 EPD Marine and Riverine Water Quality Monitoring Stations in Port Shelter Water Control Zone

Figure 5.2                 Locations of Water Sensitive Receivers

Figure 5.3                 River Water Quality Monitoring Stations at Sai Kung River

Figure 5.4                 River Water Quality Monitoring Stations at Pak Kong River

Figure 5.5                 River Water Quality Monitoring Stations at Ho Chung Channel

Figure 5.6                 Schematic Design for Temporary Drainage Division

Figure 6.1a                Sediment Sampling Locations (Sai Kung River and Sha Ha Diversion Culvert)

Figure 6.1b                Sediment Sampling Locations (Pak Kong River)

Figure 6.1c                Sediment Sampling Locations (Ho Chung Channel)

Figure 7.1                 Location of Potential Contaminated Areas observed by Site Inspection

Figure 7.2                 Potentially Contaminative Workshops

Figure 7.3                 Locations of Concerned Potential Zones for Site Investigation

Figure 8.1A               Areas of Conservation Interest: Sai Kung River and Sha Ha Stream

Figure 8.1B               Areas of Conservation Interest: Pak Kong River

Figure 8.1C               Areas of Conservation Interest: Ho Chung Channel

Figure 8.2a                Habitat Map: Sai Kung River and Sha Ha Stream

Figure 8.2b                Habitat Map: Pak Kong River

Figure 8.2c                Habitat Map: Ho Chung Channel

Figure 8.3                 Proposed Receptor For Ehretia Acuminata

Figure A9.05A          Landscape Resources: Sai Kung River

Figure A9.05B          Landscape Resources: Pak Kong River

Figure A9.05C          Landscape Resources: Ho Chung Channel

Figure A9.06A          Landscape Character Areas: Sai Kung River

Figure A9.06B          Landscape Character Areas: Pak Kong River

Figure A9.06C          Landscape Character Areas: Ho Chung Channel

Figure A9.06D          Landscape Character Areas – Photographic Record

Figure A9.07A          Planning And Urban Control Framework: Sai Kung River

Figure A9.07B          Planning And Urban Control Framework: Pak Kong River

Figure A9.07C          Planning And Urban Control Framework: Ho Chung Channel

Figure A9.08A          Unmitigated Landscape Impact: Sai King River

Figure A9.08B          Unmitigated Landscape Impact: Sai King River

Figure A9.08C          Unmitigated Landscape Impact: Pak Kong River

Figure A9.08D          Unmitigated Landscape Impact: Pak Kong River

Figure A9.08E           Unmitigated Landscape Impact: Ho Chung Channel

Figure A9.08F           Unmitigated Landscape Impact: Ho Chung Channel

Figure A9.09             Summary Of Unmitigated Landscape Impacts

Figure A9.10A          Location Of Visually Sensitive Receivers And Zone Of Influence: Sai Kung River

Figure A9.10B          Location Of Visually Sensitive Receivers And Zone Of Influence: Pak Kong River

Figure A9.10C          Location Of Visually Sensitive Receivers And Zone Of Influence: Ho Chung Channel

Figure A9.11A          Unmitigated Visual Impacts Photomontage 1/VSR 1 

Figure A9.11B           Unmitigated Visual Impacts Photomontage 2/VSR 2 

Figure A9.11C           Unmitigated Visual Impacts Photomontage 3/VSR 3

Figure A9.11D          Unmitigated Visual Impacts Photomontage 4/VSR 4

Figure A9.12A          Landscape Mitigation Measures-sheet 1 of 2

Figure A9.12B          Landscape Mitigation Measures-sheet 2 of 2

Figure A9.13A          Landscape Mitigation Proposals: Sai Kung River

Figure A9.13B          Landscape Mitigation Proposals: Sai Kung River

Figure A9.13C          Landscape Mitigation Proposals: Pak Kong River

Figure A9.13D          Landscape Mitigation Proposals: Ho Chung Channel

Figure A9.13E           Landscape Mitigation Proposals: Ho Chung Channel

Figure A9.14             Summary Of Residual Landscape Impacts

Figure A9.15A          Residual Visual Impacts – Photomontages VSR 1

Figure A9.15A(1)      Residual Visual Impact: Photomontage 1a – Enlarged Image of Year 10 Mitigated View

Figure A9.15B          Residual Visual Impacts – Photomontages VSR 2

Figure A9.15B(1)      Residual Visual Impact: Photomontage 2a – Enlarged Image of Year 10 Mitigated View

Figure A9.15C         Residual Visual Impacts – Photomontages VSR 3

Figure A9.15C(1)      Residual Visual Impact: Photomontage 3a – Enlarged Image of Year 10 Mitigated View

Figure A9.15D          Residual Visual Impacts – Photomontages VSR 4

Figure A9.15D(1)      Residual Visual Impact: Photomontage 4a – Enlarged Image of Year 10 Mitigated View